Springfield Solar

The 884-acre Springfield Solar Project Would Be A 100 MW Solar Electric Generating Facility Located in Dodge County, WI. It would Also Require the Construction of a New 138-Kv Substation and An Approximately 500-foot New 138-Kv Generator Tie Line. The Project would include solar arrays, access roads, ancillary facilities, above-ground collector circuits, underground collector circuits, a new collector substation, and an operations and maintenance building.