The 350-acre Beaver Dam Solar Project is an Estimated 50-megawatt (MW) Solar Project Located In Dodge County, Wisconsin. It will Connect to the Electrical Transmission Grid Directly Through the Local Substation.
The 350-acre Beaver Dam Solar Project is an Estimated 50-megawatt (MW) Solar Project Located In Dodge County, Wisconsin. It will Connect to the Electrical Transmission Grid Directly Through the Local Substation.